11042019-Saumur

Saumur: elected officials visit the construction site of the doubling of the Écluse bridge

Infrastructures Division

12047 vues

On Tuesday 2 April, Eiffage Génie Civil teams had the pleasure of welcoming Christian Gillet, President of the Maine-et-Loire Departmental Council, accompanied by departmental councillors and local elected officials, including Jackie Goulet, Mayor of Saumur, to the site of the doubling of the Écluse Bridge in Saumur. The visit was supervised by the Departmental Roads Department.

It should be recalled that the doubling of the Écluse bridge is part of the 2 x 2-lane construction of the Pocé - Pont du Cadre Noir section in Saumur. The 154 m long mixed structure is being built in a consortium with Eiffage Métal.

The visit allowed to appreciate the civil engineering works ending on the supports and the installation of temporary piers for the assembly of the structure.

Photos Credit: Eiffage Branche Infrastructures