As part of an operation to secure a level crossing, and after the preparatory work and earthworks, we intervened over a long weekend to slide a 160 tons pedestrian structure over 26 meters for 2 hours and a 1,000 tons road structure over 30 meters in 7 hours, to their final location.
Our territorial coverage allows us to intervene in both large-scale and one-off operations.
Congratulations to the teams for their work.
www.eiffage-aevia.com
Log in
to see or publish a comment