This major renovation has modernized and beautified the promenade through several key features:
- A widened promenade with the creation of a 900 m² wooden boardwalk, part of which is cantilevered over the beach.
- A new two-way cycle path using light-colored asphalt, which helps to reduce urban heat islands.
- Secured and upgraded roadways and pedestrian paths.
- A redesigned car park with improved accessibility for people with reduced mobility.
- A re-vegetated promenade featuring newly created planters and trees.
Our teams deployed their expertise across all road and utility works (VRD), including: demolition, earthworks, reinforcement of the sea wall, creation of the stormwater drainage system, installation of 2 km of kerbs, and the application of various surfacing materials (asphalt, sand-finished concrete, wooden boardwalk).
The project also stands out for its sustainable features, notably the creation of a runoff water collection system. This water is systematically treated by a silt and grease separator before being discharged into the sea, thereby preserving the coastal water quality.
Congratulations to our teams for this achievement!
Client & Project Lead: Toulon Provence Méditerranée
Credit: Lionel Barbe - Occidrone